top of page
Pier 27 Cruise Ship Terminal
San Francisco, CA
The new cruise ship terminal includes the demolition of the existing Pier 27 maritime shed, which opens up the site for the construction of an approximately 88,000-square-foot, two-level cruise terminal facility and the Northeast Wharf Plaza. The proposed size of the terminal is defined as optimal to serve current and anticipated ship berthing requirements and associated passenger flow
bottom of page